1. Materials used

MaterialQuantityUnit priceCost
$68.00 / sheet$204.00
$18.00 / set$18.00
$85.00 / sheet$170.00
$9.50 / board ft$285.00
$24.00 / yard$288.00

Cost to build is worked out from these. To change it, change the materials or quantities (or the price in the library).

2. Additional costs

3. Profit

Margin means profit is 35% of the selling price. Selling price = cost $1,310.00 ÷ (1 − 35%) = $2,015.38. Profit $705.38 is 35% of $2,015.38 (53.8% of the cost).

The price follows the cost: if a material price changes, the selling price moves to keep this profit.

Cost breakdown

Cost to build (materials)$965.00
Labour$290.00
Workshop overhead$55.00
Total production cost$1,310.00
Selling price$2,015.38
Profit$705.38
Margin35%