← Products
Import products
One row per material. Materials are matched by name against the library, so add any missing materials first.
Columns: product, type, material, quantity, then optional labour, other, margin. Transportation is added per quote, not per product. Put the extra costs and margin on the first row of each type. Types that already exist have their materials and costs replaced.
